Picture Description 5-13-98
Work location 5 - Pictures were taken on May 13th.
blockouts and plumbing for urinals .jpg
decking at col A (west wall).jpg
decking at west wall.jpg
decking overview H-L.jpg
Elev pit no. 3 h20proof.jpg
plumbing risers through beams.jpg
she bolts at beams line 5.jpg
slab blockout at auditorium.jpg
steel at drum and terrace OOPS.jpg
temperature steel.jpg